Project: 100kW grid connected installation, Kileler, Larissa

The installation was realized on a private owned lot.  The inverters used are  SMA STP 12000TL, the 2-axis trackers are Atlas D180 by Mechatron and the PV panels are Suntech245W.

click on picture to enlarge