Project: 19.80 kW grid connected installation
in Aidini, Almyros Magnesia
19.80kW
The instalation iss realized in a private lot in Aidini, Magnesia. The modules used are LG 220W poly and inverters KACO Powador 6650xi. The installation is using 2-axis tracking system by ELVITYL.
click on pictures to enlarge